4. Scarify, spray and mix another 10 centimeters of soil, spraying and blading back and forth until the soil is thoroughly mixed / wetted to OMC.
5. Grade and shape the bottom layer material and lightly compact (one pass without vibratory followed by one pass with vibratory.
6. Blade the treated top layer material onto the bottom layer and continue blading to shape and form the desired contour / crown. (reserve a small amount of treated fines at the shoulder for finishing.
7. Begin compacting the shaped and formed road. Use the reserved material to fill in any small holes or low spots. Continue compacting with full vibratory until the installation is very tight and then static roll for at least one hour.